Saturday, 27 April 2013
Editing Day Thirteen - 24th April
On the 24th of April, we finally were able to
complete our editing for our opening sequence. We were able to figure out how
to insert the ‘Fade to Black’ effect between our title sequences and to
successfully manage to split up the flash back and the present date. By finding
this effect it made the opening sequence look so much better which meant it
finally linked together. The only thing left to do is add the music which Sam
will have completed by Fridays lesson.
Editing Day Twelve - 19th April
On the 19th of April Lisa was in Media on her own
due to Sam, Aimie and I being on a geography trip. In this hour lesson Lisa was
able to add more titles to our sequence. Lisa also did some research on other
film sequences and got some ideas of her own and added them to our opening
sequence. Lisa was able to find a
lighting effect this meant the film could flow more. On the 24th
Aimie, Sam and I will able to look at what Lisa has completed and add our own
ideas if need be.
Editing Day Eleven - 17th April
In the double lesson that we had on the 17th of
April we were able to finalise the shots by making sure that the shots link,
this meant that we were able to add more titles into our sequence and hopefully
add some sort of effect. When we watched the film throw we noticed a major
problem one that we noticed before but didn’t do anything about it as we had to
change programs, this problem is the lighting. When watching the sequence as we
filmed on different days and different times the lighting is different in
nearly every shot, we found that the camera automatically set itself on night
mode when we were filming in the Cabin. Due to this dilemma we are trying to
find an effect on the editing program to see if we are able to make all the
lighting the same, this will make our film flow easier and won’t look out of the
ordinary. Unfortunately, we are having some difficulties finding an effect to
do this on Premier Pro as none of us have used this program before this course.
As we haven’t used this program before the titles and effects are static which
could come across as boring, however we are trying our best to put more of an
effect on our title sequence.
Editing Day Ten - 17th April
On the 17th of April we had a double lesson
however Aimie and I decided to go to Media during our study period this gave us
more time to edit as an individual and meant that Aimie had more time to learn
how to use the software. Within this study period Aimie and I noticed some
major problems with the film that Kieran goes from helping Sam then jumps to
standing behind Sam, we hadn’t realised this problem before but we had no time
to go and re-film so we have to leave this jump in our opening sequence.
Another problem was that Sam lays Lisa at the lack and then all of a sudden she
is turned over, this problem was easily sorted out due to Aimie and I looking back
at the unedited shots and finding that shot that shows Lisa being turned over,
this shot is now in the opening sequence and we have found that it makes the
film flow more.
Editing Day Nine - 16 April
On the 16th of April Lisa, Sam and I went back
after school to continue editing our opening sequence. We didn’t stay long as
there wasn’t much left we could do and always there were some decisions that
had to be made which meant we needed Aimie. We got the final extension date
which is the 30th April.
Editing Day Eight - 8th April
On the 8th of April we went back to school to get
hopefully complete the editing. We were in school for 2 and a half hours. In
this time we managed to add more titles and were continuing to put shots in
order. This was not straight forward as through this short period of time we
faced some problems, one of them being shots were missing so the storyline didn’t
make sense so we had to find the shot we were looking for and re-add it. The
next problem was that the program kept on shutting down, this meant that all
the work we had done would disappear and wouldn’t save, this was a problem as
we kept having to do the same shots and editing over and over again due to the
program not saving our work. We managed to solve this problem by every little
crop, add scenes, title we would have to immediately save it, this way if it
did shut down we wouldn’t have to start all over again.
On this date we finally decided the name of our film we went
with ‘The Cabin’, this is due to the Cabin being the main feature of our film,
however if we think of a better name in the next couple of days we can always
change it. With this extended deadline
as a group we were confident that we would be able to complete the opening sequence,
this meant Sam had to start his music as soon as the titles were added.
Friday, 26 April 2013
Getting Our Extension
Due to our extension, we decided to go back to school during our Easter holidays. We picked the 8th of April as it worked for all of us, we agreed to meet around 10am to continue the editing and hope we are able to get our final product.
Wednesday, 17 April 2013
Editing Day Seven - 27th March
The last day of editing before our Easter holidays had taken
place was on Wednesday 27th March. This lesson all of us were present,
this meant we were able to show Aimie the editing we had already done on
Premiere Pro and how to use it so she could begin editing. In this lesson we
took it in turns to edit shots and cut them if need be, Aimie needed assistance
now and again but grew confident with the new program as the lesson went on. In
this lesson we were able to put the shots in order and all the shots had been edited
now we just needed to put them all together and make sure they link together.
Due to the time code problem the group decided to come back one day in our
Easter holidays, this would allow us to get more editing completed and be ready
for when we come back to begin our evaluations.
Subscribe to:
Posts (Atom)